Search by job, company or skills

micron semiconductor asia operations pte. ltd.

Global Facilities Construction Schedule Control Manager

10-12 Years
SGD 8,300 - 16,600 per month
new job description bg glownew job description bg glownew job description bg svg
  • Posted 9 hours ago
  • Be among the first 10 applicants
Early Applicant

Job Description

Responsibilities

  • Accountable for driving compliance with defined Global processes and procedures across all construction project activities

  • Develops and maintains comprehensive documentation, including process frameworks, audit reports, and project controls guidelines, ensuring accuracy, clarity, and accessibility for all project stakeholders

  • Serve as the primary interface between line planning, engineering, construction, procurement, and finance teams on all scheduling and risk matters

  • Partner with the BIM team to ensure 4D BIM models are aligned with construction schedules and updated throughout the project lifecycle

  • Collaborate with estimating teams on baseline schedule and cost integration

  • Project Control scope includes the following but not limited to:

  • Lead Scheduling

  • Develop, maintain, and manage fully integrated master project schedules using industry-standard scheduling tools (Primavera P6, Microsoft Project)

  • Lead 4D BIM scheduling by integrating 3D models with project schedules to visualize construction sequences and optimize workflow planning using tools such as Autodesk Navisworks Bentley Synchro, or equivalent

  • Establish and enforce schedule governance standards, including WBS structure, activity coding, logic relationships, baseline management, and schedule health metrics

  • Conduct regular Critical Path Method (CPM) analysis, float analysis, and schedule variance reporting

  • Drive look-ahead scheduling (2-week, 4-week) in collaboration with field teams and contractors

  • Coordinate schedule integration with procurement, design, construction, and commissioning teams

  • Perform schedule compression / acceleration analysis and evaluate time-cost tradeoffs using generative scheduling techniques

  • Risk Management:

  • Lead the development and maintenance of the project risk register, including qualitative and quantitative risk assessments

  • Execute probabilistic schedule risk analysis using Oracle Primavera Risk Analysis (PRA) - including Monte Carlo simulations, tornado chart analysis, and confidence level reporting (P50/P80/P90)

  • Identify and quantify risk drivers, model mitigation strategies, and recommend contingency levels for schedule and cost

  • Facilitate risk workshops with project stakeholders to identify, assess, and prioritize risks

  • Develop and track risk response plans and mitigation actions

  • Perform What-If scenario analysis to test impacts of risk events on schedule and cost outcomes

  • Integrate risk analysis outputs into project reporting and executive dashboards.

  • Project Controls & Reporting:

  • Develop and maintain earned value management (EVM) reporting - tracking SPI, CPI, schedule variance, and cost variance

  • Prepare and present project controls reports (weekly, monthly, executive level) including schedule status, risk summary, and forecast-to-complete

  • Develop and maintain integrated project dashboards combining schedule, cost, risk, and quality data

  • Support project closeout activities including schedule analysis, lessons learned, and as-built documentation.

  • Any other duties that required based on priorities by the management.

Skills / Qualifications:

  • Bachelor's degree in Engineering, Construction Management, Architecture, or related field

  • Degree in any engineering disciplines / project management / construction or equivalent.

  • Minimum 10 years of experience in project controls, scheduling, and/or risk management on large capital construction or industrial projects

  • Minimum 5 years in a lead scheduler or project controls leadership role

  • Proven experience on complex projects in semiconductor fab, data center, industrial, or comparable high-tech construction environments preferred

  • Strategic thinking with strong analytical and problem-solving skills

  • Excellent communication and executive presentation skills

  • Ability to lead cross-functional teams and influence without direct authority

  • High attention to detail with strong data integrity standards

  • Adaptable and resilient in fast-paced, dynamic project environments

  • Results-oriented with a continuous improvement mindset

  • Proficient in:

  • MS Office (Words, Excel, Powerpoint, Project),

  • Project Control platforms: Primavera P6, Acumen Fuse, Smart PM, Procore, Autodesk Forma, Autodesk Revit

  • Automation dashboards software (Power BI, Power Automate)

More Info

Job Type:
Industry:
Employment Type:

Job ID: 145529753

Similar Jobs