M&E Coordinator/Senior M&E
united singapore builders pte. ltd.- Posted 3 hours ago
- Be among the first 10 applicants
Job Description
Job Description & Requirements
. ConductingSWC coordination meeting with LTA E&M team, LTA project team, N1007 andSWC's.
. Checkingthe BIM model before issuing to N1007 for CCSM, CSD/SEM, CSCSM for theirpreparation and submission to LTA.
. Reviewingconsultant drawing and submission to LTA and N1007 for review and approval.
. DesigningTunnel cable brackets, Service crossover bridge, VICP and CRP for LTA's SystemWide Contractors (SWC).
. Liaisingwith vendor to check and verifying the LTA design requirements and compliances.
. PreparingE&M Niches drawing as per contract and LTA/SWC's requirement,
. CheckingST submission drawing, Tunnel alignment drawings, vertical alignment drawings& long section drawings for coordination with SWC's and tunnel bracketdesign.
. Designingtunnel walkaway pipe trench based on working session with LTA SWC coordinatorand consultant as per their requirement.
. Coordination with vendor for Architectural works.
. Coordinating with clients, SWC,project team and contractors for E&M designand construction works.
. Assistingand explaining BIM team to model the E&M related works like Plumbing,Sanitary, CSD/SEM, Airwell and submission to LTA for approval.
. Liaisingwith Architect for design coordination.
. AttendingLTA's Line wide NSC E&M meeting, Weekly design meeting and progressmeeting.
. Liaisingwith own structural consultant for M&E design requirement and coordination.
. Liaisingwith Interfacing contractors for SWC related matters.
. AssistingPD/SPM for urgent works and E&M related works.
. Preparingtemporary design drawing for Bus stop, Pedestrian Overhead bridge, Walkaway forLTA approval.
. Preparingdesign drawings like SWC equipment delivery and future replacement drawing, CSDdrawing for LTA review and approval.
. Reviewingall LTA E&M SWC design drawing for coordination such as Tunnel ventilationsystem, Niches, AID camera, LUS, LBS, MVMS, PA, CCTV etc.
. Liaisingwith LTA MES team for Tunnel jet fan coordination and Air Monitoring Systemequipment's.
. AttendingBIM coordination meeting with N1007 & LTA for BIM CCSM and CSCSMcoordination.
. Preparingcover letter, scope of works and formal drawing submission with QAQC team fordrawing submission to LTA.
. Highlighting QS team for changes in tender drawing compare with latest issueddesign drawings.
. ExecutingSingapore standards COP and requirements.
. PrepareSWC coordination meeting minutes.
. UpdatingSWC items inputs/status in LTA progress and design meeting.
. Checking& review documents & drawings before submission to clients.
. PreparingE&M Niches drawing.
. Liaisingwith Architect & structural consultant for design coordination.
. AssistingDesign Manager/Project Director for urgent works and E&M related works.
. Preparingtemporary design drawing.
. Ad-hocworks.
