Search by job, company or skills

10-13 Years
SGD 4,200 - 5,000 per month
Early Applicant
  • Posted 29 days ago
  • Be among the first 10 applicants

Job Description

Key Responsibilities

  • Lead and supervise site teams for the installation, testing and commissioning of RTUs in 6.6kV and 22kV substations
  • Install, terminate and test control, signalling and communication wiring between RTUs, protection relays, meters, transducers and switchgear
  • Carry out fault-finding, repair and replacement of RTUs, I/O modules, power supplies and communication equipment
  • Read and work from single line diagrams, wiring schematics and panel drawings
  • Perform point-to-point and signal verification with the control room or SCADA team during commissioning
  • Follow permit-to-work, lock-out/tag-out and electrical safety procedures at live substations, and conduct toolbox briefings
  • Coordinate with project managers, engineers and client representatives on schedules, site access and handover
  • Prepare site records, test reports and as-built mark-ups
  • Guide and train junior technicians and ensure workmanship meets client and statutory standards

Requirements

  • Minimum 10 years of hands-on experience in electrical and electronic installation and repair, preferably in substation, SCADA or RTU works
  • Proven experience with 6.6kV and 22kV substation environments
  • Strong knowledge of RTU wiring, control and signalling circuits, and industrial communication protocols (e.g. Modbus, IEC 60870-5-104, DNP3)
  • Able to supervise a team and work independently on site
  • Familiar with Singapore workplace safety requirements and substation access procedures
  • Relevant electrical or engineering qualification (e.g. Nitec/Higher Nitec/Diploma) or equivalent work experience
  • Able to work on-site at various locations in Singapore, including occasional after-hours or shutdown work
  • Good communication skills in English

More Info

Key Skills

Industrial communication protocols

Electrical safety procedures

Substation SCADA

RTU wiring

Installation testing and commissioning of RTUs

IEC 60870-5-104

6.6kV and 22kV substation environments

DNP3